Traffic Detours start on Topeka Blvd. and US 24 project

ROADWAY

[lin_video src=http://eplayer.clipsyndicate.com/embed/player.js?div_id=videoplayer-1372381188&height=510&page_count=5&pf_id=9622&va_id=4120209&width=480&windows=2 service=syndicaster width=480 height=510 div_id=videoplayer-1372381188 type=script]

Lane changes at US Highway 24 and Topeka Boulevard are now in effect.

Demolition on the old bridge and construction of a new one will soon begin.

Eastbound and westbound traffic has now been re-routed around the US 24 bridge over Topeka Boulevard.

Westbound shifted around noon Thursday…eastbound, later Thursday afternoon.

Traffic will be reduced to one lane in each direction through late September.

US 24 traffic will travel around the construction on the newly built shooflys that connect the ramps on either side.

Demolition will begin next Monday and last through Wednesday.

Westbound US 24 traffic will only be able to exit northbound on Topeka Boulevard.

Eastbound will only be able to exit southbound.

Drivers will not be able to access US 24 from Topeka Boulevard during construction.

blog comments powered by Disqus